Critical components: six checks on their certificates before signing the EU declaration of conformity

Switch, plug, cord: six checks on critical component certificates before signing the EU declaration of conformity for an electrical appliance.

Critical components: six checks on their certificates before signing the EU declaration of conformity

When a brand has a small electrical appliance made outside the European Union and sells it under its own name, the factory usually sends, with the test report, a set of certificates: switch, plug, cord, connector, internal wiring. These documents only prove something if they match the parts actually fitted, if they are still valid on the day you check them, and if the certified ratings cover the intended use. Those are the points a test laboratory or a French inspector will ask about, and it is the EU declaration of conformity, signed by the brand, that carries the responsibility.

This article is for quality managers and own-brand owners who have to draw up or redo their technical documentation, often after an inspection in France. It sets out a fictitious case, the legal framework, then the six checks to run on the list of critical components before signing, with a template, timeframes, a document list and a checklist. Guillaume Leclerc assists businesses with these questions as part of his work on regulatory compliance reviews of products.

The case: certificates sent by the factory and four points to revisit (fictitious example)

A brand sells a power strip or a desk lamp (fictitious example). The factory sends the certificates for the switch, the plug, the cords, the connector and the wires. On review, four issues appear:

  • One switch is certified for a number of operating cycles lower than the assumption used by a laboratory.
  • Some certificates are valid only as long as they still appear on the website of the body that issued them.
  • The cross-section of a cord still has to be checked for the most powerful model.
  • The list of components was copied from an old certificate.

None of these findings means on its own that the appliance is unsafe. They show that the file, as received, does not yet demonstrate the conformity of the parts on which safety depends, which is what the brand must be able to show once it signs. Each point should therefore be reworked before signing, not in a hurry after a request from the authorities.

For a power strip, a preliminary question arises: Annex II of Directive 2014/35/EU excludes plugs and socket-outlets for domestic use from its scope, so the applicable legislation should be confirmed with the laboratory before any declaration is drafted. The examples below use the mains-powered desk lamp.

What the rules say about the components of an electrical appliance

Small mains-powered appliances fall under Directive 2014/35/EU of 26 February 2014 (the Low Voltage Directive), transposed in France by Decree No. 2015-1083 of 27 August 2015. It covers equipment designed for use at a rated voltage between 50 and 1,000 volts AC and between 75 and 1,500 volts DC. The references below are to the Directive, which the Decree reproduces.

The manufacturer answers for the whole appliance, including its parts

The manufacturer must ensure that the equipment has been designed and manufactured in accordance with the Directive's safety objectives (Article 6(1) and Annex I). Annex I expressly covers the electrical equipment together with its component parts, which must be made so that they can be safely and properly assembled and connected. An importer or distributor that places the appliance on the market under its own name or trade mark is considered a manufacturer (Article 10). In practice, it is often the brand, not the factory, that draws up the technical documentation and signs the declaration.

Technical documentation and series production

For this type of appliance, the procedure is internal production control (Module A in Annex III of the Directive, reproduced in Annex III of the Decree). The technical documentation must make it possible to assess conformity and include an adequate analysis and assessment of the risks. Where applicable, it contains a general description, design and manufacturing drawings and schemes of components, sub-assemblies and circuits, the standards applied, design calculations and examinations, and test reports. Component certificates are not listed as such: they come in as evidence, usually through the critical components table in the test report.

The manufacturer must also have procedures so that series production remains in conformity, taking account of changes in the design or characteristics of the product (Article 6(4)). A component swapped by the factory without notice breaks that link: the appliance delivered is no longer quite the one that was described and tested.

Signing the declaration commits the brand

By drawing up the EU declaration of conformity, the manufacturer assumes responsibility for the compliance of the equipment (Article 15(4)). The Annex IV model includes the product identification, a statement of sole responsibility, the harmonised standards applied, and the name, function and signature of the signatory, with place and date. The declaration is continuously updated (Article 15(2)) and kept with the technical documentation for ten years after placing on the market (Article 6(3)). Compliance with harmonised standards published in the Official Journal gives a presumption of conformity (Article 12), which assumes that the tests relate to the appliance actually sold.

What the authorities can do

Where a product does not comply, the market surveillance authority requires the operator to take appropriate and proportionate corrective action within a set period: bringing the product into conformity, preventing it from being made available, withdrawing or recalling it, or even destroying it (Regulation (EU) 2019/1020, Article 16). The technical documentation and declaration are among the first documents requested in an inspection; our article on responding to a DGCCRF request for documents explains that step, and if a procedure ends in a fine, our article on challenging a DGCCRF fine in France sets out the available remedies.

What is a critical component?

The term is mainly used by laboratories and in test reports for the parts on which safety depends: those that carry or switch the current, insulate live parts from the user, or must withstand heat. On a desk lamp, this usually means the power cord, plug, switch, connectors and internal wiring, plus any other part the laboratory identifies. The critical components table in the report states, for each part, its manufacturer, reference, ratings, standard and conformity mark or certificate. It links what was tested, what is certified and what is produced; the six checks below confirm that these still match when you sign.

The six checks on critical component certificates

1. Reconcile the list, the test report and the appliance as built

Compare line by line the critical components table in the test report, the certificates sent by the factory, and dated internal photos of a unit from current production. Manufacturer, reference and ratings should be identical in all three; any difference raises the question of whether the part fitted is equivalent to the part tested, which is for the laboratory to assess. In the case above, the list had been copied from an old certificate: ask the factory for its current bill of materials and new internal photos, then redo the comparison.

2. Check each certificate online, on the issuing body's website, on the day

A component certificate may expire, be suspended or withdrawn, or no longer cover the reference fitted. Some bodies state on the certificate that its validity must be checked in their online database. Check on the issuing body's own website, using the certificate number, not through a link or copy sent by the factory. Record the holder, reference, standard, status and date of the check, and keep a dated screenshot showing the page address. If a certificate no longer appears, raise it with the factory and the laboratory before signing.

Table 1 - Critical components tracking template

Component Certificate (number) Issuing body Validity checked on Ratings Notes
Switch [number] [body] [date - screenshot attached] [current, voltage, temperature, number of cycles] [accepted / question for the laboratory]
Plug [number] [body] [date - screenshot attached] [current, voltage] [accepted / question for the laboratory]
Power cord [number] [body] [date - screenshot attached] [cord type, cross-section, current] [to be confirmed for the most demanding model]
Connector [number] [body] [date - screenshot attached] [current, voltage, temperature] [accepted / question for the laboratory]
Internal wiring [number] [body] [date - screenshot attached] [cross-section, insulation, temperature] [accepted / question for the laboratory]
[Other component identified by the laboratory] [number] [body] [date - screenshot attached] [relevant ratings] [accepted / to be tested / to be replaced]

3. Check the ratings: current, voltage, temperature, cycles, intended use

The certified ratings must cover the component's actual operating conditions: rated current and voltage compared with the appliance, rated temperature compared with the heating where it is fitted and, for a switch, the number of operating cycles certified. In the case above, the switch was certified for fewer cycles than a laboratory assumed. Ask the laboratory in writing which clause of the standard it relies on, and whether the switch can be accepted, tested within the appliance or must be replaced. Certificates usually refer to component standards, such as the EN 61058 series for switches for appliances or the EN 60730 series for automatic electrical controls; the laboratory says whether what they certify meets the appliance standard, in the edition applied.

4. Check the cord cross-section against the rated current

When a range comes in several models, the factory sometimes fits the same cord to all of them, although the current drawn varies, and product standards generally set a minimum conductor cross-section according to the rated current. Start with the most demanding model, often the most powerful one: note its ratings from the rating plate, identify the cross-section and type of the cord actually fitted, and have the laboratory confirm compliance, then state whether its conclusion extends to the other models.

5. Have the laboratory validate the whole list in its review

When ordering a document review or tests, ask the laboratory to give a written view component by component: certificate accepted, component to be tested within the appliance, or component to be replaced. Practices differ: some laboratories accept certificates issued under an international scheme, others ask for additional tests, at extra cost and time. This is often where a lawyer helps to put the questions in writing, compare the answers and keep a record of what was validated.

6. Lock the list in the technical documentation and in the factory contract

Once validated, the list is dated, numbered and filed in the technical documentation. Any change to a critical component should then be notified by the factory and approved before the batch concerned is made. Without that commitment, the brand may sign a declaration that is accurate on the day and inaccurate for the next batch. The list belongs in an annex to the manufacturing contract, with pre-shipment inspection and record-keeping clauses drafted case by case.

Table 2 - The four findings in the case: what they may mean and possible next steps

Finding What it may mean Possible next step (to be decided with the laboratory)
Switch certified for fewer cycles than a laboratory assumed The switch may not cover the intended use, or the laboratory's assumption may go beyond what the standard requires Ask in writing for the standard relied on; have the switch tested within the appliance or replace it with one certified for enough cycles
Certificate valid only while listed on the issuing body's website Validity cannot be taken for granted on the strength of the document received Check online on the day; keep a dated screenshot; failing that, request an up-to-date certificate or other evidence
Cord cross-section to be checked for the most powerful model The cord shared across the range may be insufficient for that model Note the ratings of each model; have the laboratory confirm the cross-section; plan a suitable cord if needed
Component list copied from an old certificate The list may no longer match current production Obtain the current bill of materials and internal photos; redo the reconciliation; ask the laboratory whether further tests are needed

Timeframes and costs (orders of magnitude)

The internal reconciliation and online checks usually take a few days, depending on the number of components and how quickly the factory sends its documents (order of magnitude); plan dated written reminders. A laboratory document review is in the order of EUR 1,500 to 7,000 excluding VAT over 2 to 12 weeks; if components must be tested or replaced, further tests are added, with a full test programme in the order of EUR 10,000 to 25,000 excluding VAT over 6 to 10 weeks as an upper bound (orders of magnitude). The declaration is signed only after the laboratory's conclusions, on its actual date, and kept for ten years.

Documents to gather before signing

  • The test report, with its critical components table and the list of models covered.
  • The factory's current bill of materials, dated and versioned.
  • Dated internal photos of a production unit, for each model that differs.
  • The certificates for each critical component, with the dated record of their online check.
  • The component data sheets showing their ratings.
  • The rating plate of each model and the reference of the cord fitted.
  • The laboratory's written answer, component by component.
  • The locked list of critical components and the factory's written commitment to notify any change.

Checklist: the six checks before signing the EU declaration

Tick each line only once the supporting document is on file; any open line is a question for the factory or the laboratory.

Table 3 - Checklist of the six checks on critical components

Check Question to ask Supporting document Done on
1. Reconciliation Do the report list, the certificates and the fitted components match for each model? Current bill of materials and dated internal photos [date]
2. Online validity Does each certificate appear today on the issuing body's website? Dated screenshots or exports showing the page address [date]
3. Ratings Do current, voltage, temperature and number of cycles cover the use in the appliance? Component data sheets and laboratory opinion [date]
4. Cord cross-section Does the cord cross-section meet the standard for the most demanding model, then for each model? Rating plates, cord certificate, laboratory confirmation [date]
5. Laboratory validation Has the laboratory given a written view on each component? Dated laboratory review or report [date]
6. Locked list Is the list dated, versioned, filed in the technical documentation and annexed to the factory contract? Locked list and the factory's notification commitment [date]

Frequently asked questions about critical components and their certificates

Does an expired component certificate invalidate my file?

Not automatically. The Low Voltage Directive does not list component certificates among the elements of the technical documentation: what matters is that the appliance, components included, meets the safety objectives and that the file shows it. An expired or withdrawn certificate does weaken that showing. Depending on the case, the brand could obtain an up-to-date certificate, have the component tested within the appliance, or replace it, in agreement with the laboratory.

Who should provide the component certificates?

In practice, the factory, which buys the components. Yet the business placing the appliance on the market under its own name must hold complete technical documentation and signs the declaration, hence the value of a manufacturing contract that requires up-to-date certificates, the bill of materials and internal photos, and prior notice of any component change.

Does the laboratory check the components?

In a review or test programme, the laboratory usually examines the critical components table and the certificates. How far it goes depends on its quote, so ask it in writing to give a dated view component by component.

Conclusion

Critical component certificates only prove something if they match the appliance produced, are valid on the day and have ratings that cover the use. The six checks described here allow the brand to sign the EU declaration knowing what it commits to. Where this work is part of a compliance programme followed by the French authorities, the timetable announced and the way documents are presented also matter. Guillaume Leclerc assists brands at each stage, from reading the authority's findings to answering it, in coordination with the laboratory; see our page on DGCCRF and DDPP inspections in France.

Guillaume Leclerc, avocat at the Paris Bar, Victoris law firm, 34 avenue des Champs-Élysées, Paris.

Further reading: