After bringing a product into compliance: controlling your non-EU factory so that later batches stay compliant

Manufacturing outside the EU: factory file, design lock, markings, pre-shipment checks, 10-year records. The clauses that keep later batches compliant.

After bringing a product into compliance: controlling your non-EU factory so that later batches stay compliant

A brand that has its products made outside the European Union sometimes comes out of a DGCCRF or DDPP inspection with a rebuilt file: test reports reviewed by a laboratory, technical documentation, EU declaration of conformity, new rating plates and instructions. The next batch still has to leave the factory identical to the model that was assessed. A different switch, a different cord or an old address on the rating plate, and the file no longer describes the product on sale.

EU rules on electrical equipment do not stop at the assessment of a model. They require the manufacturer to ensure that series production remains in conformity, to take design changes into account and to be able to identify its suppliers for ten years. When production takes place outside the Union, these obligations can only be met if the contract with the factory organises them.

We start from an anonymised case, then describe six steps. This article is for own-brand companies and importers manufacturing outside the EU, whom the firm assists with their international contracts.

The case: a factory that had "sent everything", with no declaration and no cross-reference table

The following situation comes from the firm's practice. It is anonymised and reported without any additional detail.

Once the gaps had been identified, the laboratory offered to "liaise with the factory". The factory claimed to have sent "all the documents in its possession", had neither a declaration of conformity nor a cross-reference table of product references, and acknowledged that compliant production was possible at an extra cost.

What the factory calls "all the documents" may not cover what the brand needs for its technical documentation; without a cross-reference table, it is hard to show that the product sold is the one tested; and if compliant production is possible at an extra cost, the contract must describe precisely the product ordered and how the brand checks it. The laboratory is not a party to the manufacturing contract, and the regulatory obligations remain with the operator placing the product on the market under its name.

Why the whole production run must be controlled, not just the first batch

The manufacturer must keep series production compliant

For electrical equipment designed for use within certain voltage limits, such as a fan or a desk lamp, operators' obligations are set by Directive 2014/35/EU of 26 February 2014, implemented in France by Decree No. 2015-1083 of 27 August 2015. Article 4 of the decree lists the manufacturer's obligations, starting with ensuring that the equipment is designed and manufactured in line with the safety objectives, and drawing up the technical documentation.

Article 6(4) of the Directive requires manufacturers to ensure that procedures are in place for series production to remain in conformity, taking into account changes in product design or characteristics and in the standards applied. Where appropriate given the risks, they carry out sample testing of products on the market and, if necessary, keep a register of complaints, non-conforming products and recalls. Annex III adds that the manufacturer takes all measures necessary so that the manufacturing process and its monitoring ensure conformity with the technical documentation.

Selling under your own brand generally means taking on the manufacturer's obligations

The decree defines the manufacturer as the person who manufactures electrical equipment or has it designed or manufactured, and markets it under its own name or trademark (Article 2, 3°). Under Article 10 of the Directive, an importer or distributor placing equipment on the market under its own name or trademark is considered a manufacturer. Before the authorities, the conformity of batches sold under the brand is therefore, in principle, the brand's responsibility; the contract gives it the means to meet that obligation.

The importer checks, and an EU-based operator answers to the authorities

Where the brand imports the goods itself, importer obligations also apply: checking that conformity assessment was carried out and that the documentation and CE marking exist, sample testing where the risks warrant it, and keeping a copy of the declaration for ten years (Directive, Article 8). Regulation (EU) 2019/1020 also requires, for products covered by Directive 2014/35/EU among others, an economic operator established in the Union to check that the declaration and technical documentation exist, respond to authority requests, report risks and cooperate on corrective action; its name and postal address appear on the product, packaging, parcel or an accompanying document (Article 4).

The contract with the factory is often governed by the Vienna Convention

A contract under which a factory manufactures and delivers products is, in principle, a sale under the United Nations Convention on Contracts for the International Sale of Goods of 11 April 1980 (CISG): Article 3 treats contracts for goods to be manufactured as sales, unless the buyer supplies a substantial part of the materials. The CISG applies between parties in different States where those States are Contracting States or where private international law leads to the law of a Contracting State (Article 1); the parties may exclude it or derogate from it (Article 6).

Article 35 requires the seller to deliver goods of the quantity, quality and description required by the contract, packaged as the contract requires. Under Articles 38 and 39, the buyer must examine the goods within as short a period as is practicable and give notice of a lack of conformity within a reasonable time, and at the latest within two years of actual delivery, unless this is inconsistent with a contractual guarantee period. The contract should therefore state expressly that the products comply with applicable EU rules and the approved technical documentation, and organise inspection before shipment: a defect found by the authorities long after arrival could be harder to raise against the factory.

Step 1 - Obtain a minimum file from the factory

The first request concerns the documents the brand needs to build and maintain its technical documentation. Annex III of the Directive describes its content: description of the equipment, design and manufacturing drawings, schemes, list of standards applied, results of calculations and test reports.

The minimum file includes the circuit diagram, drawings, bill of materials, list of critical components with valid certificates, internal photos of each model and evidence on substances. We always add a cross-reference table, signed by the factory, linking the factory reference, the brand's commercial reference and the test report covering each model. The contract should require delivery of this file before the first series order, updates after every change, and the brand's right to share it with its laboratory, advisers and the authorities: on a reasoned request from a national authority, the manufacturer must provide the information and documentation needed to demonstrate conformity (Directive, Article 6(9)).

Table 1 - The minimum file to obtain from the factory

Document What it is used for Point to watch
Circuit diagram and drawings Describe the product in the technical documentation and compare it with the goods received Dated version, linked to the model ordered
Bill of materials Know what is fitted, reference by reference Updated after every component change
Critical components list and certificates Link each safety component to a certificate Validity checked on the date of each order
Internal photos Compare a series sample with the assessed model One dated set per model
Evidence on substances Support the substances part of the file Identified supplier declarations or analysis reports
Cross-reference table Link factory reference, brand reference and test report Signed by the factory, updated for each new model
Factory test reports Starting point for the laboratory review Model tested identical to the model ordered

Step 2 - Lock the design and the critical components list

Once conformity has been established for a model, its design must be locked. A design lock clause prohibits the factory from changing a critical component, its supplier, a material, the circuit or the manufacturing process without prior written notice and the brand's written approval. It covers first the parts on which electrical safety depends, such as the switch, plug or cord.

The notice period should leave the brand time to consult its laboratory before production starts; for example, the contract may require thirty days' notice before any production including the change. The brand then has the change assessed and updates its documentation. The contract also covers unavailable components (the factory proposes a certified equivalent and waits for approval) and the consequences of an unauthorised substitution: rejection of the batch, replacement at the factory's cost, payment of re-tests.

Step 3 - Impose markings through a signed specification

Rating plates, packaging and instructions are often printed by the factory. The Directive requires a type, batch or serial number or other identification (Article 6(5)), the manufacturer's name, trade name or trademark and a postal contact address (Article 6(6)), and instructions and safety information in a language determined by the Member State (Article 6(7)); in France, they must be in French. The importer also indicates its contact details (Article 8).

The most reliable way to obtain these markings batch after batch is a specification signed by the factory, with the approved artwork of the plate, packaging and instructions attached, each with a version number. The factory prints only the current version. The batch number must be identical on the product and on its packaging and linked to a specific order, so that from a unit taken in a shop the brand can trace the order, production date, components and inspection report.

Step 4 - Pre-shipment inspection and re-tests on series samples

Pre-shipment inspection checks, on the finished batch and before loading, that the goods match the approved model: appearance, visible components, rating plate, batch number, packaging, instructions and a few simple electrical checks on a sample. The contract sets who carries it out (brand staff, an inspection company or the factory with a photo report), the sampling plan, the report format and what happens on failure. A dated report also helps give prompt notice of a defect under Articles 38 and 39 CISG.

A re-test is different: samples taken from a series batch, at the factory or on arrival, are sent to a laboratory to check that they perform like the assessed model. A common approach in practice is for the brand to pay for routine re-tests and for the factory to pay for those that reveal a gap, and for any repeat test after correction. As a rough guide, full testing costs EUR 10,000 to 25,000 excluding VAT over 6 to 10 weeks, and an electromagnetic compatibility test alone EUR 1,500 to 5,000 (orders of magnitude).

Step 5 - Keep the evidence for ten years and organise cooperation

The manufacturer keeps the technical documentation and the EU declaration of conformity for ten years after the equipment has been placed on the market (Directive, Article 6(3)); the importer keeps a copy of the declaration for the same period (Article 8). Operators must also be able to identify, on request, who supplied them and whom they supplied, for ten years after supply (Article 11). The contract should require the factory to keep its batch records for the same period and provide them on request, even after termination.

Cooperation should be organised before it is needed, for three situations: a document request or inspection by the authorities (see our note on the DGCCRF request for documents), a shipment held at customs, and a defect that calls for corrective action, withdrawal or recall. For each, the contract names a contact at the factory, sets a response time and lists the information to provide: batches, quantities, components, inspection results.

Step 6 - Keep a register of batches, arrivals and reports

The register links, for each batch, the order, references, marking version, checks and arrival. When a unit is sampled in a shop or a shipment is held, the brand can quickly show customs or the DGCCRF which batch it belongs to and which checks were made. It also supports the identification obligations (Article 11). A spreadsheet is enough if it is updated for every batch.

Table 2 - Model register of batches and arrivals

Batch Order References and quantities Checks Arrival
[Batch number on product and packaging] [Purchase order number and date; specification version] [Brand reference, factory reference, quantity; bill of materials version] [Pre-shipment inspection report, date, result; re-test: yes or no, report] [Arrival date, customs declaration, invoice, storage location]
[Next batch] [Same] [Change approved since the previous batch: nature, date of approval] [Same] [First customers or distributors supplied]

Checklist: compliance clauses in the manufacturing contract

These clauses may sit in a framework agreement, in general purchasing terms accepted by the factory or in a specification attached to each order. They supplement the usual supply terms (price, quantities, lead times, payment). Governing law and jurisdiction should be chosen at the same time: a clause is only useful if it can be enforced against the factory.

Table 3 - Checklist of compliance clauses in the manufacturing contract

Clause What it should provide Evidence
1. Technical file List of documents, delivery before the first order, updates, use before the authorities Signed delivery slip
2. Design lock No change of critical component, supplier or process without notice and written approval Dated critical components list attached
3. Markings Approved artwork, version number, batch number format Signed specification
4. Pre-shipment inspection Inspector, sampling, report, consequences of failure Dated report for each batch
5. Re-tests Sampling, choice of laboratory, cost allocation depending on the result Sampling record and test report
6. Ten-year record keeping Production records per batch, disclosure on request, survival after termination Survival clause and archives
7. Cooperation in inspections, customs holds and recalls Named contact, response time, information to provide "Contacts and deadlines" schedule
8. Liability and warranty Compliance with EU rules, warranty, recall and re-test costs, insurance Insurance certificate, signed clause

This checklist shows what the contract should cover. It does not say how to draft each clause for a given factory, or what balance is realistic given the volumes ordered and the brand's reliance on its supplier. That is where the support of a lawyer in international contracts and product compliance makes the most difference.

How the firm can help

Guillaume Leclerc usually steps in after a compliance project triggered by an inspection. He reviews the factory's documents with the brand and its laboratory, drafts or reviews the compliance clauses (framework agreement, purchasing terms, specification) in French and English, proposes a register template and prepares the following imports. The laboratory and any inspection company are paid directly by the company.

Frequently asked questions

Can I require the factory to hand over the technical file?

EU rules target the manufacturer, the importer and other economic operators. Where the product is sold under the brand, we have not identified any provision directly requiring the non-EU factory to hand its drawings to its customer: the contract creates that obligation. It is safer to make delivery of the file a condition of the first series order, with a non-disclosure agreement if the factory asks for one.

Who pays for re-tests?

The legislation does not allocate this cost; the contract must. In practice, the brand often pays for routine re-tests and the factory for those that reveal a gap, as well as any repeat tests after correction.

What if the factory changes a component without notice?

Identify the batches concerned through the register and suspend their shipment or sale while the change is analysed; the laboratory then assesses whether conformity is affected, and the documentation is updated or the original component restored. If products presenting a risk have already been sold, the obligations to take corrective action and inform the authorities may apply (Directive, Articles 6 and 8). If the contract provides for it, the batch can be rejected and the costs charged to the factory.

Does the contract with the factory relieve me of my responsibility before the authorities?

In principle, no. The contract governs the relationship with the factory and gives a remedy against it; it does not transfer to the factory the obligations that the rules place on whoever markets the product under its name or imports it. It does give you, on the day of an inspection, the documents showing batch-by-batch monitoring.

Conclusion

A compliance project covers one model at one date. For later batches to stay compliant, a brand manufacturing outside the EU needs a usable file from the factory, a locked design, its own markings, pre-shipment checks, ten-year records and a batch register, each backed by a clause it can enforce.

If your company is coming out of an inspection and preparing its next orders, or wants its purchasing terms reviewed before a new shipment, Guillaume Leclerc can review your documents and identify the clauses to rework; see our page on DGCCRF and DDPP inspections in France.

Guillaume Leclerc, avocat at the Paris Bar, Victoris law firm, 34 avenue des Champs-Élysées, Paris.