Bringing a product into compliance after an inspection in France: the full path, the cost, the risks

After a DGCCRF or DDPP inspection: list the criticisms, suspend sales, use a laboratory, draw up the EU declaration. Steps, costs, timetable and risks.

Bringing a product into compliance after an inspection in France: the full path, the cost, the risks

After a visit from inspectors or a request for documents, a brand that sells products made outside the EU under its own name often finds that the problem lies less in the product itself than in the documents that should accompany it: no EU declaration of conformity, no technical documentation, no contact details for the manufacturer and the importer on the appliance or in the instructions. The DDPP (the departmental consumer protection office) or the DGCCRF (the French consumer protection authority) then expects a precise answer: what is corrected, what is committed to, and by when the rest will be done. The compliance work usually takes several weeks, involves a testing laboratory and costs from a few thousand to a few tens of thousands of euros (orders of magnitude).

This article is for managers of businesses selling appliances made outside the EU under their own brand. It starts from an anonymised case, sets out what the rules expect from an own-brand seller, then describes the firm's nine-step path, with a timetable, costs, risks and the documents to gather. Examples are taken from fans, desk lamps, power strips and chargers. To have your products and documents reviewed before or after an inspection, see our page on regulatory compliance reviews.

The case: an own brand, missing documents and tests on a single model (anonymised case)

A small business sells small electrical appliances made outside the EU under its own brand. The authority criticises the absence of an EU declaration of conformity (DoC), of technical documentation and of the contact details of the manufacturer and the importer. The business only has factory tests carried out on a single model of the range. Within a few weeks: sales suspended, new rating plates and instructions sent, several laboratories consulted, a critical review ordered, and a new date given to the authority before the initial deadline.

The criticisms concern documents and markings, and they cannot all be fixed at the same pace. Missing contact details are dealt with through new plates and instructions; the declaration and technical documentation require knowing what the available tests demonstrate, and tests on one model do not, on their own, cover the rest of the range.

What the rules expect from an own-brand seller

A brand selling under its own name carries the manufacturer's obligations

Equipment designed for use between 50 and 1,000 V AC or 75 and 1,500 V DC falls under the Low Voltage Directive 2014/35/EU, transposed in France by Decree No. 2015-1083 of 27 August 2015. The directive defines the manufacturer as the person who manufactures electrical equipment, or has it designed or manufactured, and markets it under its own name or trademark (Article 2(3)). An importer or distributor is treated as a manufacturer when it places equipment on the market under its own name or trademark (Article 10, transposed in Article 8 of the decree). A business putting its brand on appliances made by a third-party factory therefore, in principle, bears the manufacturer's obligations.

The documents the inspector expects to find

The manufacturer draws up the technical documentation and carries out the conformity assessment procedure; once compliance with the safety objectives has been demonstrated, it draws up an EU declaration of conformity and affixes the CE marking (decree, Article 4). Both documents are kept for ten years from placing on the market. The technical documentation includes in particular a description, drawings and diagrams, the harmonised standards applied and the test reports (directive, Annex III). The declaration follows the model in Annex IV, including the name, function and signature of the signatory. By drawing it up, the manufacturer assumes responsibility for the conformity of the equipment (decree, Article 13).

The product bears a type, batch or serial number and the name or trademark of the manufacturer and of the importer, each with a postal address (directive, Articles 6 and 8). Instructions and safety information must be in a language easily understood by users, in practice French for a product sold in France. Regulation (EU) 2019/1020 also requires an EU-based economic operator who can provide these documents to the authorities and whose contact details appear on the product, packaging, parcel or an accompanying document (Article 4(3) and (4)). The inspectors' power to demand documents is explained in our article on the DGCCRF request for documents under Article L. 512-8.

Step 1 - List the criticisms one by one

Take each criticism from the authority's documents, without adding or removing anything, and note the provision relied on and the finding. Then split them into two groups:

  • Paper fixes: the rating plate, the packaging, the instructions, the contact details of the manufacturer and the importer. Mock-ups can usually be ready within about two weeks.
  • Points that need technical verification: the declaration of conformity and the technical documentation, which can only be drawn up once it is known what the tests really demonstrate.

This avoids promising a declaration within two weeks when nobody has reviewed the test reports, or waiting for a laboratory to correct a plate.

Step 2 - Classify each measure: done, committed, scheduled

Each criticism receives one or more measures, sorted into three columns. "Done" contains only what is finished and backed by a document. "Committed" contains what has been decided in a verifiable way: signed quote, order placed, laboratory chosen. "Scheduled" gives a date for everything else. This table becomes the backbone of the reply and is updated at each deadline.

Model "done / committed / scheduled" table (fictitious example)

Criticism Measure Done Committed Scheduled (order of magnitude)
Missing manufacturer and importer details New plates, packaging and instructions Mock-ups proofread and sent to the factory Production of the new plates Next batches, order date stated
Sales of models without a DoC Sales suspended Suspension in place, dated screenshot - Until the DoC is drawn up
Factory tests on a single model Critical review by an accredited laboratory Offers received and compared Review ordered, purchase order signed Findings in 2 to 12 weeks depending on the laboratory
No technical documentation Technical file built List of models settled Documents requested from the factory After the laboratory's findings
No EU declaration of conformity Drawn up in the brand's name - - After the technical documentation

Step 3 - Suspend sales of what cannot be fixed immediately

For models whose declaration cannot be drawn up quickly, suspending sales is often the first measure the authority expects. As a general rule, the directive requires a manufacturer with reason to believe that equipment is not in conformity to take corrective measures (Article 6(8)). Presented as a precaution pending the assessment, the suspension shows the criticisms are taken seriously without conceding them. It covers every channel, is announced in writing with its date, and is proven by a dated screenshot showing the page address and by emails to resellers. The sentence sent to the authority should say only what the evidence shows.

Step 4 - Redo plates, packaging and instructions

  • The name, trade name or registered trademark of the manufacturer and of the importer, each with a postal contact address.
  • The model reference, identical to the one in the declaration and the technical documentation.
  • A batch number identical on the appliance and the packaging, linked to the factory order.
  • Warnings and safety instructions in French.
  • The separate collection symbol for waste electrical and electronic equipment, which producers affix to equipment placed on the market (Directive 2012/19/EU, Article 14(4)).

The CE marking presupposes that conformity has been demonstrated and the declaration drawn up (decree, Article 4), so its presence on the new mock-ups follows the timetable of the declaration. The firm recommends two rounds of proofreading before files go to the factory.

Step 5 - Have the existing reports reviewed by an accredited laboratory

When the business only has factory tests, the question is what they cover: which model, which standards and editions, which components, and whether other models can rely on them. A laboratory accredited for the relevant standards can carry out a critical review (document review), identify gaps and specify any additional tests. Laboratories do not always agree on the scope of those tests, so it is worth consulting several and asking them the same questions.

As orders of magnitude, a document review costs EUR 1,500 to 7,000 excluding VAT and takes 2 to 12 weeks depending on the laboratory. Full testing costs EUR 10,000 to 25,000 excluding VAT and takes 6 to 10 weeks. An endurance test, where a laboratory considers it necessary, is priced on top. Electromagnetic compatibility testing alone costs EUR 1,500 to 5,000. The offer and purchase order should be in the name of the business placing the product on the market; a confidentiality agreement allowing the reports to be shown to the authority, the factory and advisers should be signed before any documents are sent; and the general terms (liability cap, deposit, governing law, deliverable) read before signing.

Step 6 - Give the laboratory a note on the criticisms

A laboratory answers more usefully when it knows exactly what the authority criticises. The note sets out the chronology, the products concerned and each party's role, then a table of criticisms: provision relied on, finding, what has already been done, question for the laboratory. It asks for an answer criticism by criticism and model by model, with the form and date of the deliverable. It is covered by the confidentiality agreement and attaches no document from criminal proceedings.

Step 7 - Draw up the technical documentation and the declaration, with their real date

Both documents are drawn up in the brand's name, and only after the laboratory's findings. They bear their real date: a backdated declaration, or one drawn up before the assessment, would contradict the rest of the file. Where an appliance falls under several EU acts requiring a declaration, a single declaration is drawn up for all of them (Directive 2014/35/EU, Article 15(3)). The declaration identifies each model covered, cites the harmonised standards actually applied with their edition, and is signed by a person authorised to bind the business, with name and function.

Step 8 - Keep the dates you promised, or warn before the deadline

Dates given to the authority become commitments. When a date cannot be met, for instance because a laboratory has revised its lead time, the business warns the authority before the deadline, not after. The message gives the reason, the order placed and a realistic new date, which may be a "first update" three weeks later rather than a date for the final document, and confirms that sales remain suspended.

Three time limits should not be confused: the time limit set by the authority in its letter or in an injunction, which must be reasonable (Consumer Code, Article L. 521-1); the right to be heard within a period of not less than ten working days before a market surveillance measure targeting a product, save in urgent cases (Regulation (EU) 2019/1020, Article 18(3)); and the one-month period to comment on a proposed administrative fine under the Consumer Code (Article R. 522-2).

Step 9 - Attach the documents requested, and nothing else

Each attachment answers a question that was asked; a document added "for completeness" often opens a new one. Documents are numbered in the order of the table of measures. The reply is sent by the firm, as adviser, or by the business with the manager in copy; either way, it binds the business. Accuracy comes before speed: an inaccurate document or a deliberately delaying answer could be examined as obstruction of the inspectors (Consumer Code, Articles L. 512-4 and L. 531-1).

The risks, without overstating them

  • Petty offences: Article 15 of Decree No. 2015-1083 punishes several failures with the fine for fifth-class petty offences, starting with importing or placing on the market equipment that has not undergone the conformity assessment; other documentary failures could fall under the same article. The fine is up to EUR 1,500 for an individual (Criminal Code, Article 131-13) and five times that for a company (Article 131-41), i.e. EUR 7,500. Several failures could be recorded separately.
  • Deception: if the authority considers that a product was sold knowing it was not compliant, the offence of deception (Consumer Code, Article L. 441-1) carries three years' imprisonment and a EUR 300,000 fine (Article L. 454-1). Intent must be established.
  • Obstruction: obstructing the inspectors carries two years' imprisonment and a EUR 300,000 fine (Articles L. 512-4 and L. 531-1).
  • Administrative measures: an injunction to comply within a reasonable time, possibly with a daily penalty of up to EUR 3,000 capped at EUR 300,000 in the general case (Article L. 521-1); compliance at the operator's expense within a set time (Article L. 521-10); suspension of placing on the market, withdrawal, recall or destruction by order (Article L. 521-7); and comparable corrective measures under Regulation (EU) 2019/1020 (Article 16(3)). Options for contesting such decisions are covered in our article on how to challenge a DGCCRF fine in France.
  • Customs: subsequent shipments could be checked more often on entry into the EU, with goods held and storage costs; a complete file ready before each arrival limits this risk.

Typical timetable and cost ranges

Durations are orders of magnitude and depend on the number of models, the factory and the laboratories' workload.

Typical compliance timetable after an inspection (order of magnitude)

Period Actions Indicative costs and lead times Documents produced
Day 0 to day 15 List of criticisms, sales suspended, mock-ups of plates, packaging and instructions Mock-ups in about two weeks Table of criticisms, proof of suspension, mock-ups
Day 7 to day 30 Several laboratories consulted, confidentiality agreements, offers compared, order placed Document review: EUR 1,500 to 7,000 excl. VAT Offers, signed confidentiality agreement, purchase order
Day 30 to day 60 Critical review, note on the criticisms, gap analysis model by model Review: 2 to 12 weeks depending on the laboratory Note on the criticisms, review report
Then Additional tests, then substances work if needed Full testing: EUR 10,000 to 25,000 excl. VAT, 6 to 10 weeks; endurance extra; EMC alone: EUR 1,500 to 5,000 Test reports
End of the path Technical documentation and EU declaration in the brand's name Depends on the laboratory's findings List of models, technical documentation, signed declaration
Throughout Authority informed before each deadline - Dated letters, updated table of measures

Checklist: the 10 documents of a compliance file

No. Document What it shows
1 List of criticisms Each criticism, the provision relied on and the finding
2 Proof of sales suspension Date and extent of the suspension on all channels announced
3 Mock-ups of plates, packaging and instructions Corrected contact details, reference, batch, French warnings and markings
4 Laboratory offers Scope, price, lead time and accreditation offered by each
5 Purchase order The business's commitment, in its name, and the order date
6 Note on the criticisms given to the laboratory Questions asked criticism by criticism and model by model
7 Review report Gaps found and additional tests chosen
8 List of models References covered and how each relates to the tests
9 Technical documentation The Annex III items, including test reports
10 EU declaration of conformity Conformity declared in the brand's name, dated and signed

FAQ: bringing a product into compliance after a DDPP inspection

Can I keep selling during the compliance work?

For models whose declaration cannot be drawn up quickly, it is advisable to suspend sales on all channels, tell the authority in writing and prove it. Sales resume once the declaration is drawn up and the markings corrected; models already covered by a complete file are assessed one by one.

How much does a laboratory review cost?

As an order of magnitude, EUR 1,500 to 7,000 excluding VAT for a document review over 2 to 12 weeks, and EUR 10,000 to 25,000 excluding VAT over 6 to 10 weeks for full testing, plus any endurance test.

What if I cannot meet the date I gave the authority?

Warn the authority before the deadline, never after, with the reason, the order placed and a realistic new date, confirming that sales remain suspended.

Are the factory's test reports enough?

Not necessarily. Test reports are part of the technical documentation, but they must demonstrate the conformity of the models actually sold. A report on one model does not automatically cover the others; the critical review says, model by model, what must be added.

Who must sign the EU declaration of conformity?

The declaration is drawn up by the manufacturer, and a brand placing an appliance on the market under its own name or trademark is treated as the manufacturer. It is signed by a person authorised to bind the business, usually the manager or a delegate. The laboratory issues reports; it does not sign the declaration.

Conclusion

Bringing a product into compliance after an inspection rests mainly on method: criticisms listed one by one, paper fixes made at once, sales suspended and proven, a laboratory chosen and engaged in writing, a declaration drawn up at its real date in the brand's name, and dates kept or renegotiated before they fall due. Guillaume Leclerc assists businesses at each stage, from reading the criticisms to replying to the authority; see our page on DGCCRF and DDPP inspections in France.

Guillaume Leclerc, avocat at the Paris Bar, Victoris law firm, 34 avenue des Champs-Élysées, Paris.

Further reading: