Goods held at French customs by the DGCCRF: why your shipments are checked every time and how to get out of it

Every shipment checked, goods refused, Safety Gate alert: what happens after a first adverse customs or DGCCRF check in France and how to get out of it.

Many importers know the sequence. A first container is held on arrival, French customs announce that release for free circulation is suspended, the DGCCRF asks for the EU declaration of conformity and has the product tested, and the laboratory report finds problems. The next shipment is checked again, then the one after that. At this point the managing director realises that the company has been "flagged". For a business that sells under its own brand, supplies retailers or sells online products made outside the European Union, each week of detention means costs, stock shortages and impatient customers.

The first question we hear is almost always the same: is the company on a blacklist, and for how long? No legal text provides for a lifetime ban or a permanent blacklist of importers. The real risk is lasting targeting. The risk analysis run by customs and by the market surveillance authorities takes the operator's track record into account, which leads to repeated checks, goods held at the border and information shared with other Member States. That targeting has no fixed duration. It changes with the results of later checks and with the way the company corrects what was found.

This article explains how an importer comes to the attention of the DGCCRF (the French Directorate-General for Competition Policy, Consumer Affairs and Fraud Control) or of French customs, how an import check works under Regulation (EU) 2019/1020 on market surveillance and compliance of products, how information circulates in Europe through ICSMS and Safety Gate, and how a company can lower its risk profile or challenge a decision. If your goods are being held or your shipments are checked one after another, our law firm assists companies facing DGCCRF and DDPP inspections in France and can review your situation.

How an importer gets flagged by the DGCCRF or French customs

According to the French Directorate-General for Enterprise (DGE), which coordinates the application of Regulation 2019/1020 in France, market surveillance of non-food products is mainly carried out by the DGCCRF, with French customs (DGDDI) acting for products imported from non-EU countries.

The four usual starting points

  • An inspection in a shop, a warehouse or online: DGCCRF officers or the departmental consumer protection directorates (DDPP) visit premises, review a website or buy a product, if necessary under a cover identity (Article 14(4) of Regulation 2019/1020).
  • A complaint or report: a consumer complaint, often filed on the SignalConso platform, a competitor, another authority or an online marketplace can draw the officers' attention to a product or a brand.
  • A laboratory result: a sample is analysed, for instance by the joint laboratory service used by both customs and the DGCCRF, and the report finds non-compliance or a risk.
  • An import check: when goods are cleared, the customs declaration goes through risk analysis and customs check the documents, the markings and the details of the responsible operator before allowing release.

These channels feed each other. Market surveillance authorities must give the authorities in charge of border controls information on product categories or economic operators for which a higher risk of non-compliance has been identified (Article 25(5)). Conversely, the risk profiling carried out at the border is one of the factors market surveillance authorities consider when planning their own checks (Article 11(3)(d)).

Manufacturer, importer, distributor: the criteria that set your obligations

Before discussing a hold, you need to know in which capacity the company acts. Regulation 2019/1020 defines the manufacturer as the person who manufactures a product, or has it designed or manufactured, and markets it under its own name or trademark (Article 3(8)). The importer is the person established in the Union who places a product from a third country on the Union market (Article 3(9)). The distributor is any other person in the supply chain who makes a product available on the market (Article 3(10)). Which capacity applies depends on the facts of each case.

French law adds a general rule. Under Article L. 411-1 of the Consumer Code (Code de la consommation), the person responsible for first placing a product on the market checks that it complies with the rules in force and, when asked by the officers, shows the checks carried out. Qualification is one of the first points to review with a lawyer.

The economic operator established in the EU

For many CE-marked products, Article 4 of Regulation 2019/1020 allows placing on the market only if an economic operator established in the Union is responsible for certain tasks: the EU manufacturer, the importer where the manufacturer is not established in the EU, an authorised representative appointed in writing or, failing that, a fulfilment service provider (Article 4(2)). That operator keeps the EU declaration of conformity and technical documentation available, answers reasoned requests, reports risks and cooperates on corrective action (Article 4(3)). Its name and contact details must appear on the product, the packaging, the parcel or an accompanying document (Article 4(4)). The legislation concerned, listed in Article 4(5), includes personal protective equipment, toys, low-voltage electrical equipment, electromagnetic compatibility and radio equipment. For consumer products under Regulation (EU) 2023/988 on general product safety, Article 16 of that Regulation sets a comparable requirement.

Border controls under Regulation (EU) 2019/1020

Chapter VII of Regulation 2019/1020 (Articles 25 to 28) governs checks on products entering the Union market. These rules have applied since 16 July 2021, when the Regulation replaced the corresponding provisions of Regulation (EC) No 765/2008. They apply when goods are declared for release for free circulation, the customs procedure that gives them the status of Union goods (Article 3(25), which refers to Article 201 of the Union Customs Code).

Risk-based checks

Each Member State designates the authorities in charge of controlling products entering the Union market (Article 25(1)). In France, customs act at this stage, in liaison with the DGCCRF. Products declared for release are checked on the basis of risk analysis under Articles 46 and 47 of the Union Customs Code and, where relevant, the risk-based approach of Article 11(3) (Article 25(3)). An importer that has already been the subject of a measure may therefore see its declarations selected more often, without any formal decision.

The five grounds for suspending release

Under Article 26(1), release must be suspended where checks show that:

  • the product is not accompanied by the documents required by EU law, or there are reasonable doubts as to their authenticity, accuracy or completeness (point a);
  • the product is not marked or labelled in accordance with applicable EU law (point b);
  • the product bears the CE marking or another required marking affixed in a false or misleading manner (point c);
  • the name and contact details of the economic operator responsible under Article 4 are not indicated or cannot be identified (point d);
  • for any other reason, there is reason to believe that the product does not comply or presents a serious risk to health, safety, the environment or another protected public interest (point e).

Customs immediately notify the market surveillance authorities of the suspension (Article 26(2)). Those authorities may also ask customs to suspend release where they have reasonable grounds to believe that a product is non-compliant or presents a serious risk (Article 26(3)). A missing document calls for a quick documentary answer, whereas a doubt about safety leads to testing and, possibly, to a finding of serious risk.

Four working days, then the decision

The product is released, if all other formalities are met, where the market surveillance authorities have not asked for the suspension to be maintained within four working days of the suspension, or where they have approved release (Article 27(1)). Release is not proof of conformity with EU law (Article 27(2)): a released batch can still be checked later.

If the authority concludes that there is a serious risk, it prohibits placing on the market and requires customs not to release the product; the endorsement "Dangerous product - release for free circulation not authorised - Regulation (EU) 2019/1020" is entered in the customs data-processing system and, where appropriate, on the commercial invoice and accompanying documents (Article 28(1)). For non-compliance, the endorsement reads "Product not in conformity - release for free circulation not authorised - Regulation (EU) 2019/1020" (Article 28(2)). The endorsement follows the goods if they are declared for another customs procedure (Article 28(3)). Customs may also destroy products presenting a risk to end users' health and safety where necessary and proportionate, at the declarant's cost (Article 28(4)).

Table 1 - Steps of an import check and time limits

Step What happens Time limit Legal basis
Declaration and risk analysis The customs declaration is filtered by risk analysis, which may target a product category or an operator. When the declaration is lodged Reg. (EU) 2019/1020, Art. 25(3) and (5)
Document and physical checks Checks on documents, markings and the contact details of the EU responsible operator; samples may be taken. Variable Reg. 2019/1020, Arts. 25 and 26
Suspension of release Customs suspend release if one of the five grounds applies and notify the market surveillance authority immediately. Immediate Reg. 2019/1020, Art. 26(1) and (2)
Market surveillance position The authority asks for the suspension to be maintained or approves release. Without a request, the goods are released if other formalities are met. 4 working days from the suspension Reg. 2019/1020, Art. 27
Investigation and right to be heard Requests for documents, laboratory tests, opportunity for the operator to be heard before a measure is taken. At least 10 working days to be heard, save urgency Reg. 2019/1020, Art. 18
Decision Release, supervised corrective action, refusal with endorsement, another customs procedure or destruction. No overall time limit in the Regulation Reg. 2019/1020, Arts. 27 and 28
Recording and information Measures, test reports and corrective action entered in ICSMS; Safety Gate notification for serious risks. After the decision Reg. 2019/1020, Arts. 20 and 34; Reg. (EU) 2023/988, Art. 26

After a first adverse check: why every shipment is inspected

Your track record is part of the risk analysis

Market surveillance authorities carry out checks on an adequate scale using a risk-based approach. Under Article 11(3) of Regulation 2019/1020, they take into account the possible hazards and non-compliance associated with the products (point a), the activities under the operator's control (point b), the economic operator's past record of non-compliance (point c), the risk profiling carried out at the border (point d) and consumer complaints and other information (point e).

Point c explains most situations described by "flagged" importers. A finding of non-compliance, a measure, an adverse test report all become part of the record. Combined with the information passed to customs on higher-risk operators (Article 25(5) and recital 52), that record can lead to more frequent selection of the company's declarations, and for a while to a check on every shipment.

No permanent blacklist, but a risk profile

No legal text provides for a permanent blacklist of importers or a lifetime import ban. The Regulation works with risk factors, shared information and risk profiles, all of which change with the results of later checks. Measures prohibiting placing on the market concern specific products. Even in case of serious or immediate danger, a ministerial order suspending the import and marketing of a product is limited to a maximum of one year (Article L. 521-17 of the Consumer Code).

How long does the targeting last?

No legal text sets a duration. The level of checks follows the risk analysis, which is updated as information comes in: results of later checks, quality of the documents produced, corrective action, new complaints. Depending on the case, targeting may ease after several compliant shipments or continue if new problems appear. A company that documents its corrections and answers quickly gives the authorities material they can take into account; one that ships the same product again unchanged adds to its own record.

EU-wide information: ICSMS and Safety Gate

ICSMS, the shared system of market surveillance authorities

Article 34 of Regulation 2019/1020 provides for an information and communication system known as ICSMS. Market surveillance authorities enter in it, among other things, measures taken where the operator has not acted or the risk persists, reports of their tests, corrective action taken by economic operators and available reports on injuries caused by the product (Article 34(4)). According to a June 2021 Commission services note, this also applies to products whose release was suspended. Measures taken by one authority are communicated through ICSMS (Article 16(6)) and, where the measure is considered justified, authorities in other Member States take the necessary measures regarding the product (Article 16(7)).

Safety Gate, the rapid alert system for dangerous products

Since 13 December 2024, Regulation (EU) 2023/988 on general product safety has replaced Directive 2001/95/EC. It sets up the Safety Gate Rapid Alert System, the new name of RAPEX (Article 25). Member States notify through it corrective measures concerning products presenting a serious risk, whether taken by the authorities or by economic operators themselves (Article 26(1)(a)). They may also notify measures for lower risks (Article 26(3)), and other Member States send follow-up notifications when they act (Article 26(7)). For harmonised products, Article 20 of Regulation 2019/1020 likewise requires notification of measures concerning products presenting a serious risk where their reasons or effects go beyond the national territory, including voluntary measures by operators. Regulation 2023/988 also requires an importer who finds that a product is dangerous to inform the manufacturer and ensure that the authorities are informed through the Safety Business Gateway (Article 11(2) and (8)).

Publication on the Safety Gate Portal

Regulation 2023/988 provides for public access to selected information notified through Safety Gate (Article 34), and the Commission publishes a summarised version of alerts on the Safety Gate Portal. It can be read by retailers, marketplaces and competitors, and it does not disappear because the batch was re-exported or destroyed. According to the Commission, only national authorities can request an update or withdrawal of an alert. After corrective action, or where new evidence calls the initial assessment into question, the request must go through the French authority that made the notification.

Suspension, refusal, corrective action, destruction: the possible measures

At the border

Depending on the nature of the non-compliance and the level of risk, several outcomes are possible. In a press release of 22 December 2021 about non-compliant hair products held at Le Havre, French customs explained that, under customs supervision, the importer could choose between bringing the goods into conformity with laboratory testing, re-export after informing customs authorities in other Member States, or abandonment for destruction.

In France, for products already sold

Where the same model has already been released and sold, the authority requires the operator to take appropriate and proportionate corrective action without delay: bringing the product into compliance, stopping its availability, withdrawal, recall, destruction or warnings (Article 16(2) and (3)). If the operator does not act or the risk persists, the authorities ensure that the product is withdrawn, recalled or prohibited (Article 16(5)). The Consumer Code provides similar powers, including suspension of marketing, withdrawal, recall and destruction (Article L. 521-7).

Who pays

The Regulation allows Member States to let their authorities recover from the operator the full costs of their activities relating to non-compliance, including testing, storage and measures under Article 28 (Article 15). Private costs (terminal storage, container detention and demurrage, customs broker fees, relabelling) are often heavier and keep running while the goods are immobilised.

Table 2 - Possible measures and their effect on the goods

Measure When it applies Effect on the goods Legal basis
Release No request to maintain the suspension within 4 working days, or approval by the authority. Goods are cleared. Release is not proof of conformity: later checks remain possible. Reg. 2019/1020, Art. 27
Suspension Missing or doubtful documents, missing or misleading marking, EU operator not identified, other doubts. Goods immobilised; storage and container costs keep running. Reg. 2019/1020, Art. 26
Corrective action before release Correctable non-compliance (labelling, instructions, contact details), with the authority's agreement. Work carried out under supervision, then release if validated. Reg. 2019/1020, Art. 15(2)
Refusal for non-compliance The authority concludes that the product does not comply. Endorsement "Product not in conformity - release for free circulation not authorised - Regulation (EU) 2019/1020". Reg. 2019/1020, Art. 28(2)
Refusal for serious risk The authority concludes that there is a serious risk. Ban on placing on the market, endorsement "Dangerous product - release for free circulation not authorised - Regulation (EU) 2019/1020", Safety Gate notification where effects extend beyond France. Reg. 2019/1020, Arts. 19, 20 and 28(1); Reg. 2023/988, Art. 26
Other customs procedure or re-export No objection from the market surveillance authority. Goods leave the route to the EU market; the endorsement follows them. Reg. 2019/1020, Art. 28(3)
Destruction Risk to the health and safety of end users where deemed necessary and proportionate, or abandonment by the importer. Stock lost; cost borne by the declarant. Reg. 2019/1020, Art. 28(4)
Withdrawal, recall, suspension in France Same model already released and sold. Removal from shelves and websites, recall from customers, handling costs. Reg. 2019/1020, Art. 16; Consumer Code, Art. L. 521-7

What a held shipment really costs

The only time limit set by Chapter VII is the four working days given to market surveillance to ask for the suspension to be maintained. After that, the Regulation sets no overall deadline for the final decision. Duration depends on documents from the supplier, possible testing and the right to be heard, which in principle means at least ten working days before a measure is taken (Article 18). When tests are needed, a hold can therefore last several weeks. Retailers may apply late-delivery penalties, and online marketplaces, which have their own product safety obligations (Article 22 of Regulation 2023/988), may suspend listings while the situation is clarified. An adverse import check can also lead to checks on batches already sold, an injunction or, in serious cases, a report to the public prosecutor.

Lowering your company's risk profile

No legal text provides for a formal "rehabilitation" procedure for an importer. The risk profile improves when the factors behind it change.

Technical documentation ready before shipment

The EU declaration of conformity, technical documentation, test reports and details of the responsible operator must be available before the goods leave the factory, for the exact model shipped, and must be provided on reasoned request in a language the authority can easily understand (Article 4(3)). A declaration covering another model, an old test report or missing instructions are enough to raise the reasonable doubt referred to in Article 26(1)(a).

Pre-shipment testing and batch checks

Authorities must take due account of test reports or certificates issued by an accredited conformity assessment body (Article 11(5)). Tests carried out before shipment on samples from the batch actually shipped are therefore useful evidence, provided they cover the relevant requirements and the link between sample and goods can be shown.

Corrective action documented and reported

Corrective action by operators is recorded in ICSMS (Article 34(4)(c)). A correction the authority does not know about cannot enter its assessment, so the company should record what it has changed (supplier, specifications, labelling, incoming inspection) and report it to the authority that made the finding.

Fast and complete answers to the authorities

Economic operators must cooperate with market surveillance authorities (Article 7 of Regulation 2019/1020). A partial, late or inconsistent answer keeps doubts alive, while a complete file consistent with customs documents allows a faster decision. Requests from officers often take the form of a formal request for documents; our article on the DGCCRF request for documents and how to respond (L. 512-8) explains that procedure. This is the stage where a lawyer makes a difference: identifying the real ground for suspension, choosing which documents to produce, coordinating with the supplier and the customs broker, and preparing observations. Companies that want to act ahead of the next shipments can also ask for a regulatory compliance review of their product range and documentation.

Table 3 - What raises or lowers an importer's risk profile

This table links the factors in Article 11(3) of Regulation 2019/1020 to practical situations. It offers a reading of those criteria; their weight is for the authorities to assess.

Factor (Reg. 2019/1020, Art. 11(3)) What raises the risk What can lower it
Operator's past record of non-compliance (point c) Findings of non-compliance, measures taken, adverse test reports. Subsequent favourable checks, documented corrections reported to the authority.
Documentation EU declaration covering another model, incomplete file, late answers. A file for each model, ready before shipment and consistent with customs documents.
EU responsible operator Missing or wrong details on the product, packaging or parcel. Complete and accurate details, an operator who can be reached and answers quickly.
Testing No tests, old tests, sample with no demonstrable link to the batch. Tests by an accredited body on samples from the shipped batch (Art. 11(5)).
Activities under the operator's control (point b) Uncontrolled change of supplier, no incoming inspection. Written specifications, batch checks, traceability.
Hazards of the product category (point a) Category frequently subject to alerts. Closer attention to the requirements specific to the category.
Complaints and other information (point e) Consumer reports, returns, reports from marketplaces. Documented complaint handling, voluntary withdrawal where needed.
Border risk profile (point d) Recent holds, refusal endorsements. Successive shipments without findings.

Challenging a suspension or refusal of release

Under Article 18 of Regulation 2019/1020, any measure, decision or order of market surveillance authorities must state its exact grounds and be communicated without delay, together with the remedies available under national law and the applicable time limits. The operator must be given an opportunity to be heard within at least ten working days before the measure, unless urgent action is needed, in which case it is heard as soon as possible afterwards.

Under French law, an administrative decision can be challenged by an informal appeal to its author or to the hierarchical superior, then before the court. Before the administrative courts, the standard time limit is two months from notification (Article R. 421-1 of the Code of Administrative Justice (Code de justice administrative)). Where urgency justifies it and there is serious doubt as to the legality of the decision, the interim relief judge can suspend it (Article L. 521-1 of the same code). Depending on the authority and the legal basis of a border decision, the competent court and time limits may differ, so the notification must be read first. See also how to challenge a DGCCRF fine and the applicable time limits. In practice, much is decided earlier, in the days after the suspension, which is where legal assistance is most useful.

Fictional example: sunglasses held on every arrival

Fictional example, not based on any real case. Company X, a French SME, sells sunglasses to clothing boutiques and on its own website. The sunglasses are made outside the EU. Sunglasses fall under the personal protective equipment rules (Regulation (EU) 2016/425); according to the DGCCRF, they must carry a visible and legible CE marking and are classified in filter categories 0 to 4, category 4 being unsuitable for driving.

In spring, a container of 9,000 pairs is declared for release. Customs suspend the procedure: the EU declaration of conformity covers another model, the filter category is missing on some frames and the details of the EU responsible operator appear nowhere. The DGCCRF asks for the suspension to be maintained within four working days and takes samples. The report confirms the marking defects, without any defect in lens protection. After the company's observations, the authority accepts supervised corrective action. In our scenario, this takes just over five weeks and costs EUR 6,200 in storage and container detention, EUR 4,100 in tests for three models and EUR 2,300 in repackaging.

The next three containers are all checked, whereas the company had previously faced only occasional checks. No decision placed the company on a list and no end date was announced: the finding had simply become part of its record. With its lawyer, the company reviewed its capacity, allocated obligations with its supplier in writing, set up model-specific documentation and pre-shipment testing, and reported the measures to the authority. In this example, checks became less frequent as compliant shipments followed. Had the tests shown insufficient lens protection, the outcome would have been very different: serious risk, prohibition, Safety Gate notification and recall of batches already sold.

Frequently Asked Questions (FAQ)

My goods are held at French customs by the DGCCRF: how long can it last?

Market surveillance has four working days to ask for the suspension to be maintained; without such a request, the goods are released if the other formalities are met (Article 27 of Regulation 2019/1020). After that, there is no overall deadline: it depends on documents, testing and the right to be heard (at least ten working days before a measure, save urgency). With testing, several weeks may pass.

Is there a blacklist of importers in France or the EU?

No legal text provides for a permanent blacklist or a lifetime import ban. Authorities take the operator's past record of non-compliance into account (Article 11(3)) and pass information on higher-risk operators to customs (Article 25(5)). The result can be lasting targeting with no fixed duration, which changes with the results of later checks.

Why is every shipment checked since a first inspection?

A finding of non-compliance becomes part of the operator's record, which feeds the risk analysis, and customs and the DGCCRF share information on products and operators. No decision is notified to you on that basis. To reduce the targeting, correct the causes, document the changes and report them to the authority.

What is a Safety Gate alert and can it concern my product?

Safety Gate is the EU rapid alert system for dangerous non-food products (Articles 25 and 26 of Regulation 2023/988). Member States notify measures concerning products presenting a serious risk, including voluntary measures taken by the company. A summary is published on the Safety Gate Portal, and only national authorities can request its update or withdrawal.

Non-compliant product at customs: what should I do first?

Identify the exact ground for suspension under Article 26 of Regulation 2019/1020, gather the declaration of conformity, technical documentation and test reports for the exact model, and check the details of the EU responsible operator. The options for the goods have different effects on costs and on your record, so it helps to involve a lawyer early.

Does release of my batch prove that my product complies?

No. Under Article 27(2) of Regulation 2019/1020, release is not proof of conformity, and a released batch can be checked later.

Can a refusal of release be challenged?

Yes. The decision must state its exact grounds and the available remedies and time limits, and the operator must in principle have been heard beforehand (Article 18). Before the administrative courts, the standard time limit is two months, and urgent interim relief is possible. The competent court and the time limits must be checked on the notification itself.

Conclusion

A first adverse import check does not turn your company into a banned importer: no legal text provides for a permanent blacklist. It does create a risk profile that weighs on later shipments, because Regulation (EU) 2019/1020 makes the operator's track record a risk factor, ICSMS keeps a record of measures and Safety Gate circulates alerts on dangerous products across the EU. Getting out of it requires real and documented corrections and careful handling of the first days after a suspension. If your goods are held in France or your shipments are checked every time, the Victoris law firm can review the decision, prepare your exchanges with customs and the DGCCRF and assist you through any challenge.

Guillaume Leclerc, avocat at the Paris Bar, Victoris law firm, 34 avenue des Champs-Élysées, Paris.

Further reading: