Contracting with a testing laboratory: quote, general terms, deposit and confidentiality agreement

Testing laboratory quote: company name, liability cap, foreign law, 100% prepayment, confidentiality agreement. What to check before signing.

Contracting with a testing laboratory: quote, general terms, deposit and confidentiality agreement

A brand or an importer that needs to have its products checked for conformity usually consults several testing laboratories. This often happens after an inspection or a request for documents from the French consumer protection authorities (DGCCRF or DDPP). Each quote received is also a contract, with general terms, a liability cap, a governing law, payment terms and, very often, a confidentiality agreement to be signed before any technical exchange.

This article starts from an anonymised case, then sets out the method in six steps, the documents to gather, a checklist of eight clauses and frequently asked questions. The firm assists companies in negotiating their commercial contracts, including with the laboratories involved in a compliance project.

The case: several quotes for the same request, and as many different contracts

The facts

A company received several quotes from laboratories for the same request. Some were issued in the name of its lawyer rather than the company. One capped the laboratory's liability at a very low amount and required the client to indemnify the laboratory against third-party claims. Another was governed by a foreign law and foreign courts, and announced a report that would contain neither opinions nor interpretations. Another required 100% prepayment. As for the confidentiality agreement submitted to the company, it prohibited any disclosure to its advisers and to its factory, and protected oral information only if summarised in writing within 30 days. The case is anonymised.

What the case shows

Together, these clauses decide practical questions: who the laboratory's client is, who may use the report, who bears the risk of a testing error, which court would hear a dispute, and whether the company can show the report to the authorities, to its factory and to its distributors.

Step 1: have the quote and purchase order issued in the name of the company placing the product on the market

The review or test report serves the company that places the product on the market. Regulation (EU) 2019/1020 on market surveillance requires the economic operator it designates to provide, further to a reasoned request from a market surveillance authority, all the information and documentation necessary to demonstrate the conformity of the product, in a language that authority can easily understand (Article 4(3)). For electrical equipment, Directive 2014/35/EU, transposed in France by Decree No. 2015-1083 of 27 August 2015, requires manufacturers to draw up the technical documentation and the EU declaration of conformity and keep them for ten years after placing on the market (Article 6).

The company's lawyer may run the consultation, receive the quotes and negotiate them, but the lawyer does not place the product on the market and should not become the laboratory's client. A quote in the lawyer's name would leave doubt as to which party is bound, who owes the price, who may rely on the report or claim against the laboratory, and whose name will appear as applicant on the first page of the report. Ask for a reissued quote before signing, and check that the quote, purchase order, deposit invoice and confidentiality agreement show the same company name, address and registration number.

Step 2: compare the quotes on the same grid

As a rough guide, a document review of existing reports often costs between EUR 1,500 and 7,000 excluding VAT, with a lead time of 2 to 12 weeks depending on the laboratory; full testing between EUR 10,000 and 25,000 excluding VAT, over 6 to 10 weeks; electromagnetic compatibility testing alone between EUR 1,500 and 5,000; any endurance test is priced on top (orders of magnitude). A price gap often reflects a difference in scope: models covered, standards applied, accredited or informative report.

Table 1 - Comparing laboratory quotes: the grid

Criterion What to note in the quote Point to watch
Price Amount excluding VAT per stage (review, tests, report) and extra costs What is excluded: retests, additional models, translation
Lead time Starting point and duration Time counted from receipt of a "complete" set of samples and documents: define the word
Accreditation Accredited or informative report, standards covered Scope of accreditation to be checked for each standard
Deliverable Type of report, models covered, language Results only, or a written conclusion model by model
Payment Deposit (50% or 100%), balance, cancellation Refund in case of delay or abandonment
Law and court Governing law and jurisdiction chosen Foreign law and courts: cost and length of any dispute
Liability and insurance Cap, indemnity required from the client, insurance certificate Very low cap compared with the price and the use of the report
Confidentiality Agreement proposed, authorised recipients Disclosure to advisers, the factory and the authorities

Step 3: read the laboratory's general terms before signing

Which terms apply

Under Article 1119 of the French Civil Code, general terms invoked by one party take effect against the other only if they were brought to its attention and it accepted them. A signed purchase order referring to the laboratory's general terms will generally count as acceptance. The same article provides that, where the general terms of the two parties conflict, the incompatible clauses have no effect, and that special terms prevail over general terms. Anything negotiated should therefore appear in the quote or the purchase order itself, not merely in an email.

The liability cap

Laboratories generally limit their liability. Between businesses, such a clause is valid in principle, subject to two limits. Under Article 1170 of the Civil Code, any clause that deprives the debtor's essential obligation of its substance is deemed unwritten: a derisory cap could fall on that basis, but the assessment is made case by case and the outcome is never certain. Article 1231-3, which limits damages to those foreseen or foreseeable when the contract was made, lifts that limit in case of gross negligence or wilful misconduct, and the courts in principle set aside a limitation clause in that event too (see our guide, in French, on limitation and exclusion of liability clauses). In practice, it is safer to negotiate the cap before ordering, for instance to at least the price paid, than to rely on a judge to set it aside.

Indemnity against third-party claims and insurance

Some general terms require the client to indemnify the laboratory against any third-party claim relating to the product or the tests. Drafted too broadly, such a clause would shift the consequences of the laboratory's own error onto the company. It is reasonable to ask that it exclude claims arising from the laboratory's fault and that it be capped like the laboratory's liability. Asking for a current professional liability insurance certificate covering testing activities is a standard request.

Governing law and competent court

When the laboratory is established abroad, its general terms often choose its own law and courts. Before the courts of an EU Member State, Regulation (EC) No 593/2008 (Rome I) provides that a contract is governed by the law chosen by the parties (Article 3); failing a choice, a contract for the provision of services is governed by the law of the country where the service provider has its habitual residence (Article 4(1)(b)), even if that is not an EU Member State (Article 2). Deleting the governing-law clause is therefore not enough: without an express choice of another law, the laboratory's law would in principle apply. As for courts, Regulation (EU) No 1215/2012 gives effect to a clause choosing the courts of a Member State, regardless of the parties' domicile, and that jurisdiction is exclusive unless agreed otherwise (Article 25). If the chosen courts are outside the EU, other rules apply, and enforcing a judgment may require additional proceedings (see our guide, in French, on jurisdiction clauses).

Language and content of the report

A report limited to results, without opinions or interpretations, states the measurements without saying whether the product, or each model in a range, conforms. If the company expects a written conclusion model by model, it must ask for one in the quote. Language matters too: the EU declaration of conformity for electrical equipment is translated into the language or languages required by the Member State where it is placed or made available on the market (Directive 2014/35/EU, Article 15(2)), and documents handed to an authority must be easy for it to understand. General terms also often exclude retests made necessary by a failure or a product change: ask for their unit price in the quote. A lawyer's review is most useful at this stage, because a clause is negotiated before the order, and with far more difficulty afterwards.

Step 4: negotiate the confidentiality agreement

Even without a written agreement, Article 1112-2 of the Civil Code makes anyone who uses or discloses without authorisation confidential information obtained during negotiations liable under ordinary law. That protection requires proof of confidentiality, fault and loss; a confidentiality agreement makes the proof easier, but a one-sided text can also hamper the company's compliance work (see our guide, in French, on confidentiality clauses). Five points deserve attention:

  • The agreement should be signed by the company that discloses the documents and will receive the report, under its exact name, not by its lawyer or another entity.
  • Protection of oral information only if confirmed in writing within a short period, such as 30 days, fits poorly with technical exchanges held by phone or video call; ask for protection as soon as information is announced as confidential, or send a dated summary email after each call.
  • The authorised recipients should include at least the managers and staff concerned, the company's advisers, the factory and component suppliers, each for the information it needs and under an equivalent confidentiality obligation.
  • The company should be able to hand the report to the authorities on request and pass it on to its distributors and business customers, and any return-or-destroy clause should exclude reports and documents kept in the technical documentation, which is ten years for electrical equipment (Directive 2014/35/EU, Article 6(3)).
  • A fixed term of a few years, except for trade secrets, and the same governing law and court as the main contract, to avoid two disputes before two judges.

Requests for documents from the French authorities follow their own rules, which we describe in our article on the DGCCRF request for documents; a confidentiality agreement should not prevent the company from answering them.

Table 2 - Confidentiality agreement with a laboratory: clauses to negotiate

Clause Risky wording What the company can ask for
Named party Agreement in the name of the lawyer or another entity The company that discloses the documents and receives the report
Oral information Protected only if summarised in writing within 30 days Protection once announced as confidential, or a written summary after each exchange
Authorised persons No disclosure to advisers or the factory Managers, staff concerned, advisers, factory, suppliers, under the same obligation
Use of reports Laboratory's prior consent for any disclosure Handing over to authorities on request, disclosure to distributors and business customers
Return or destruction All documents at the end of the relationship Reports and technical documentation excluded
Term Confidentiality with no time limit Fixed term, except for trade secrets
Law and court Different from the main contract Same law and court as the main contract

Step 5: pay the deposit without exposure to fraud

The deposit requested on ordering varies: 50% in many quotes, sometimes 100%. Full prepayment puts the whole risk of delay or abandonment on the company. It can be negotiated like the rest of the quote: payment in two instalments, on ordering and on delivery of the report, or by stage (document review, tests, final report). If the laboratory insists, the quote should at least set the delivery date, the cancellation terms and the refund of the part not performed.

A first order from a new supplier, paid by bank transfer on the strength of an email, is a classic target for supplier impersonation fraud: a message imitates the laboratory and gives altered bank details. Before the first transfer, and whenever bank details change, check the IBAN by phone, using a number found on the laboratory's website or in earlier exchanges, never the one in the email that sends the IBAN. Quote the exact reference of the quote and of the deposit invoice in the transfer, and keep a dated note of the check.

Step 6: put the deliverable, its date and what triggers an amendment in writing

The quote or purchase order should describe the deliverable without ambiguity: its nature (document review, test report, accredited or not), the models covered, the standards and editions applied, the language, the form and the applicant's name. A review that merely concludes that further tests are needed, without saying which ones, for which models and at what price, would leave the company where it started.

The lead time usually runs from receipt of a complete set of samples and documents, so define what "complete" means and ask the laboratory to confirm in writing the date on which it considers the file complete. Where the company has given the authorities a date, the laboratory's date governs it, and any delay should be reported to them before the deadline. Each new stage (further tests, the laboratory's substances and environment teams, an additional model, a retest) should be the subject of a separate quote, accepted in writing before work starts. As an order of magnitude, consulting laboratories and ordering take one to four weeks; the review then takes 2 to 12 weeks and any further testing 6 to 10 weeks.

Documents to gather

  • The quotes received, with the general terms each refers to, in their dated version.
  • The chosen quote, reissued in the company's name, and the signed purchase order reflecting the points negotiated.
  • The signed confidentiality agreement in its negotiated version and the laboratory's insurance certificate.
  • The accreditation certificate and its scope for the relevant standards, where an accredited report is ordered.
  • The deposit invoice, proof of transfer and the dated note of the IBAN check.
  • Written confirmation of the date the file is deemed complete and of the delivery date, and written summaries of oral exchanges.

Table 3 - Checklist: 8 clauses to read before signing

No. Clause Question to ask To obtain in writing
1 Client identity Is the company placing the product on the market the client and the applicant on the report? Quote and purchase order in its name
2 Deliverable and date Which models, standards, language and date? Description of the deliverable and delivery date
3 Liability cap Is the cap derisory compared with the price and the use of the report? Cap at least equal to the price paid
4 Client indemnity Does it also cover the laboratory's own faults? Exclusion of the laboratory's faults and a cap
5 Insurance Is the laboratory insured for this activity? Current insurance certificate
6 Law and court Would a dispute be heard abroad, under a foreign law? Acceptable law and court, expressly chosen
7 Payment What happens in case of delay or abandonment? Schedule, cancellation, refund, price of retests and amendments
8 Confidentiality Can advisers, the factory and the authorities receive the information and the report? Authorised recipients, oral information, use of the report

Frequently asked questions

Can the laboratory's quote be in my lawyer's name?

Your lawyer may consult laboratories, receive quotes and negotiate them on behalf of the company. The contract, the invoice and the report should, however, be in the name of the company placing the product on the market: it pays, it files the report in its documentation and it may need to claim against the laboratory. Ask for a reissued quote before signing.

Can I show the laboratory's report to the authorities and to my distributors?

You must be able to hand it to a market surveillance authority that asks you to demonstrate the conformity of the product (Regulation (EU) 2019/1020, Article 4(3)). The confidentiality agreement and the general terms should say so expressly, as well as disclosure to distributors and business customers.

Should I accept full payment on ordering?

Full prepayment is negotiable like the rest of the quote. If accepted, the delivery date, cancellation terms and refund of the part not performed should be written into the quote, and the IBAN checked by phone before the transfer.

What is a very low liability cap worth?

Between businesses, a limitation of liability clause is valid in principle. A clause that deprives the laboratory's essential obligation of its substance is, however, deemed unwritten (Civil Code, Article 1170), and a limitation is in principle set aside in case of gross negligence or wilful misconduct. Whether a very low cap would fall on that basis depends on the circumstances and can never be taken for granted: negotiate it before ordering.

Conclusion

Choosing a testing laboratory commits the company to a contract. A quote in the right name, clauses read before signing, a confidentiality agreement open to advisers, the factory and the authorities, and a dated deliverable reduce the risk of a problem when the report has to be produced. Guillaume Leclerc assists importers and own-brand companies, from consulting laboratories to dealing with the authorities; see our page on DGCCRF and DDPP inspections.

Guillaume Leclerc, avocat at the Paris Bar, Victoris law firm, 34 avenue des Champs-Élysées, Paris.

Further reading: